-
Notifications
You must be signed in to change notification settings - Fork 232
Pull requests: openshift/microshift
Author
Label
Projects
Milestones
Reviews
Assignee
Sort
Pull requests list
OCPBUGS-98219: Move RBAC manifests to the services that own them
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
jira/severity-important
Referenced Jira bug's severity is important for the branch this PR is targeting.
jira/valid-bug
Indicates that a referenced Jira bug is valid for the branch this PR is targeting.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#7029
opened Jul 9, 2026 by
pacevedom
Contributor
Loading…
USHIFT-7365: add dual-stack v4/v6 scenario symmetry to c2cc CI jobs
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
lgtm
Indicates that a PR is ready to be merged.
verified
Signifies that the PR passed pre-merge verification criteria
#7027
opened Jul 9, 2026 by
agullon
Contributor
Loading…
3 tasks
NO-ISSUE: Test restart optimizations
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#7025
opened Jul 9, 2026 by
pacevedom
Contributor
Loading…
WIP: Add MTU boundary tests for C2CC IPsec
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
USHIFT-7346: C2CC upstream user documentation
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
ready-for-human-review
Indicates a PR has been reviewed by automated tools and is ready for human review
#7015
opened Jul 8, 2026 by
pmtk
Member
Loading…
USHIFT-7342: Replace hardcoded sleep with state check before restart
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
lgtm
Indicates that a PR is ready to be merged.
verified
Signifies that the PR passed pre-merge verification criteria
#6996
opened Jul 7, 2026 by
pacevedom
Contributor
Loading…
USHIFT-7221: Automate Polarion test: Verify sosreport can be consumed by omg & omc support tools
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
tide/merge-method-squash
Denotes a PR that should be squashed by tide when it merges.
#6991
opened Jul 6, 2026 by
agullon
Contributor
Loading…
3 of 4 tasks
feat: add RPM-only build mode for presubmit CI
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
USHIFT-6951: Add kube-state-metrics as optional MicroShift component
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
ready-for-human-review
Indicates a PR has been reviewed by automated tools and is ready for human review
#6809
opened Jun 5, 2026 by
copejon
Contributor
Loading…
USHIFT-6831: cert-manager Trust manager featuregate and test
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#6805
opened Jun 4, 2026 by
eslutsky
Contributor
Loading…
PERFSCALE-2104: Enable and apply fieldalignment linter
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
ready-for-human-review
Indicates a PR has been reviewed by automated tools and is ready for human review
#6789
opened Jun 2, 2026 by
sjug
Contributor
Loading…
USHIFT-6746: migrate 23 OTP router tests to Robot Framework
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
tide/merge-method-squash
Denotes a PR that should be squashed by tide when it merges.
USHIFT-6925 USHIFT-6851: Introduce Post-Quantum Curves to Ingress defaults and FIPs detection
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
lgtm
Indicates that a PR is ready to be merged.
#6622
opened May 4, 2026 by
eslutsky
Contributor
Loading…
USHIFT-6835: cert-manager create ca-bundle configmap for trust-manager
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
USHIFT-6639: Introduce test dynamic scheduling
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#6371
opened Mar 18, 2026 by
pacevedom
Contributor
Loading…
OCPEDGE-2038: Add promote-learner command
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
ProTip!
Exclude everything labeled
bug with -label:bug.